wombweller
Member
Hi All
I have a meter that requires 100/125v 50 HZ to run and I'm aware that some transformers I can use half the primary.
I have 240v house mains but with my transformers information I'm a little confused and worried about where to connect what to get what I require.
Here is the info on the transformer:
pins on it-
1...2.......3...4
0v...12v......0v...12v
info on it-
Primary input across 1 and 4
For 240v operation link 2 and 3
For 120v operation link 1 and 3 and 2 and 4
6va transformer stock no. 196-303
max load 3va per winding.
Looking for advice.
I have a meter that requires 100/125v 50 HZ to run and I'm aware that some transformers I can use half the primary.
I have 240v house mains but with my transformers information I'm a little confused and worried about where to connect what to get what I require.
Here is the info on the transformer:
pins on it-
1...2.......3...4
0v...12v......0v...12v
info on it-
Primary input across 1 and 4
For 240v operation link 2 and 3
For 120v operation link 1 and 3 and 2 and 4
6va transformer stock no. 196-303
max load 3va per winding.
Looking for advice.
Last edited: