LM723 PSU with 0V lowest voltage

Status
Not open for further replies.
My english understatement comprehension is not strong enough: what do you mean?
Erik
Sorry earckens.

Configuration control is the control of all the engineering information so that you do not get erroneous information built into the product and modifications are not missed and everyone knows what they are working on. You can imagine the problems that could arise if you had say twenty people working on a particular project, or on the space program for example, thousands.

So you have at the very least one reference drawing/drawings which everyone works too, and the drawing has a date, and issue.

Things always go wrong in engineering, but it is 'configuration control that gets you in the end', hence the saying.

spec
 
Status
Not open for further replies.
Cookies are required to use this site. You must accept them to continue using the site. Learn more…