I’m multiplexing 4 seven segments. Each seven segment needs 100mA current.
In this case the duty cycle will be 25% per segment. Means its getting only 25mA current per segment when multiplexing.
From my hardware I pump current 4times (4 X 25 = 100mA) to a segment, now what will my duty cycle value does it still 25%??
In this case the duty cycle will be 25% per segment. Means its getting only 25mA current per segment when multiplexing.
From my hardware I pump current 4times (4 X 25 = 100mA) to a segment, now what will my duty cycle value does it still 25%??
Last edited: