Hi all, I am completing modificatin of a laundry washing machine to be mass produced and need electronics to switch on/off at two stages hours apart. With my decipline, nuclear power engineering I am like allice in where is this land. I was told I need microprocessors, redirected to this forum.
Obvoiously wih least buttons to operate.
The requirements are
1. With the !id closed( a switch at the lid) ,
switch on to turn the motor on and run for period T1 and turn motor off as time period ends.
2. Stay off for period T2, regardless of signals from lid switch.
3.Turn motor on and stay on for period T3, with lid close.
4. Turn finish signal on thirty seconds following end of T3.
Depending on cost, Electrically dead of 230 volt current at the end.
I am at level zero and need all advice to select the right microcontroller, if that is indeed the right choice.
Regards joe
Obvoiously wih least buttons to operate.
The requirements are
1. With the !id closed( a switch at the lid) ,
switch on to turn the motor on and run for period T1 and turn motor off as time period ends.
2. Stay off for period T2, regardless of signals from lid switch.
3.Turn motor on and stay on for period T3, with lid close.
4. Turn finish signal on thirty seconds following end of T3.
Depending on cost, Electrically dead of 230 volt current at the end.
I am at level zero and need all advice to select the right microcontroller, if that is indeed the right choice.
Regards joe