Boncuk
New Member
The Eagle doc field of the frames is a bit overloaded displaying date and time accurate to one second.
I tried to get rid of the time stamp editing the variable name ">LAST_DATE_TIME" to ">LAST_DATE"
The result was the text ">LAST_DATE" in the doc field of a finished schematic design.
Eagle is obviously using the entire variable to be handled as a string.
Better leave it untouched.
Boncuk
I tried to get rid of the time stamp editing the variable name ">LAST_DATE_TIME" to ">LAST_DATE"
The result was the text ">LAST_DATE" in the doc field of a finished schematic design.
Eagle is obviously using the entire variable to be handled as a string.
Better leave it untouched.
Boncuk