Hi guys,
Am looking at methods of controlling a 120v kiln using a PID Ramp/Soak temperature controller. The recommended cycle time is 2 seconds so any relay (solid state or electromechanical) will be functioning rapidly. Is this going to be a problem with a solid state relay with a typical number of operations before failure rate? The cycle time of 2 seconds means tht the ssr will lat about a week, with a MTBF of 100k operations.
Thoughts/advice
Nitrous
Am looking at methods of controlling a 120v kiln using a PID Ramp/Soak temperature controller. The recommended cycle time is 2 seconds so any relay (solid state or electromechanical) will be functioning rapidly. Is this going to be a problem with a solid state relay with a typical number of operations before failure rate? The cycle time of 2 seconds means tht the ssr will lat about a week, with a MTBF of 100k operations.
Thoughts/advice
Nitrous
Last edited: