wind_brewer
New Member
I have successfully built and programmed the skywriter project. I have attached the circuit to a yard wind mill and it works well at certain wind speeds but terrible at others. I used a reed switch and a magnet mounted on the wind mill frame in place of the inertia switch that is in the original project. This works very well. Was wondering if there would be a way to change the timing of delay subroutines (del_1 and del_2) based on the how often the reed switch is triggered (how fast the wind mill is spinning)?