![]() | ![]() | ![]() |
| | |||||||
| Chit-Chat Relax for a bit and have a general conversation (off topic is allowed!) with other members. Please be polite and respect your fellow members. |
| | Thread Tools | Search this Thread | Display Modes |
| | ||
| Experienced Member | Quote:
hi Pap, The myth busters did actually blow this myth about leaving lights ON. They found it saves money if they are switched OFF when not in use, the same logic applies to 1KW motors on that 30min cycle, turn it OFF. You have only two more years of Eskom cuts!...
__________________ Eric "Good enough is Perfect" PIC tutorials: Nigel's site: http://www.winpicprog.co.uk/ Gramo's site: http://www.digital-diy.net/ | |
| | |
| | |
| New Member | Thanks Eric. BUT, as far as Eskom and the blackouts go, we still have 5 year before the first of the three new COAL fired power station will be in commission. Madupe, the first to go up is only planned to be productive by 2013. I don't know where the power will come from for the 2010 Soccer world cup. All you people from the rest of the world planning to visit for that event, remember to bring along a flashlight |
| | |
| | ||
| Experienced Member | Quote:
hi, I bought candles in PE this year, it looks as though the new PE sports stadium is on the back burner.. budget problems.
__________________ Eric "Good enough is Perfect" PIC tutorials: Nigel's site: http://www.winpicprog.co.uk/ Gramo's site: http://www.digital-diy.net/ | |
| | |
| | |
| Experienced Member | Likey not your case, but in colder climates the lighting and office equipment, and very much the staff, provide alot of the heating in a large building. Lights are left on at night to help hold the temperature. Many pieces of office equipment will give a BTU rating to show the heat production they produce. |
| | |
| | ||
| Experienced Member | Quote:
wouldn't trust that to hard that's what they said here in cambodia also but still i have 5 times a week power cuts of more that 6 hours 3 years aggo it whas next year it's over we building new plants already new plants where there but where calculated ont the demand during the calculations so no extra capacity antisipated 2 years aggo same story but with the aditional message that cambodia would be conected to the regional grid network (vietnam) 1 year aggo still no working power line athougt it is build, with the message of the power line all future planed power plants came to a hold and nobody did build annything annymore because of the prommised cable from vietnam what do we see now vietnam is also booming same as cambodia and gues what they have also power cuts now and don't even sell power to cambodia i believe the line will be working end of this year but if that is the end of the powercuts i know for sure it's not Robert-Jan | |
| | |
| | |
| Experienced Member | The fluorescent story is a nonsense. Put an analogue ammeter in series and see the currentflow during the startup cycle. It may be double or three times the running current when the starter is closing it's contacts to strike the arc in the tube. When the lamp has striken, the current remains steady and reduces even a little when the lamp warms up. If the light is not required within the next 5 minutes or so just switch it off. With motors you have to look at the duty cycle. For light starting loads just turn it off when not needed. For high inertia loads e.g. compressors, heavy flywheels etc. The motor manufacturer will specify how many starts the motor is allowed to do over a one hour period without overheating the windings. Other matters to bear in mind is wear and tear on the starting contacts. If a machine is well designed these should be adequately rated. My $0.02 worth on this subject. Regards, Raymond
__________________ There are more ways to get to Rome. Electricity, Electric clocks, Meters and Trains are great. |
| | |
| | |
| Experienced Member | zevon8, That doesn't make any sense because most places are heated by natural gas, oil, coal or even wood which is much cheaper and efficient than electricity. rjvh, I'm not having a go, (English probably isn't your first language and you might never know if no one tells you) but there's only one g in ago not two. |
| | |
| | ||
| Experienced Member | Quote:
Hi hero 999 i am totaly not offended by your coment and i do apriciate if people correct me english is not my first language and on top of that i am also dislexic that means that i write as that i remember it and other wise as how you say it spelling checks realy works fine for me before i send a letter out but i still didn't get the spelling check working in this sites reply box's Robert-Jan | |
| | |
| | |
| Experienced Member | Lighting and people are very much factored into the heat load of a building. Lighting alone can account for up to 30% of the heat load in a typical office, people factor up to about 20%. When sizing HVAC systems these numbers are significant. One calculation for heat load: http://www.engineeringtoolbox.com/he...hts-d_709.html A major study to help designers and engineers: http://www.ashrae.org/pressroom/detail/13367 Brief description of HVAC sizing based on flourescent or incandescent. ( note they mention eliminating heating based on lighting ) http://tristate.apogee.net/cool/cfrl.asp |
| | |
| Thread Tools | Search this Thread |
| Display Modes | |
| | ||||
| Thread | Thread Starter | Forum | Replies | Latest |
| Touch Sensitive Switch (Take 2) | MonkeyMera | Electronic Projects Design/Ideas/Reviews | 7 | 2nd October 2007 10:05 PM |
| Button Debounce Coding help | Suraj143 | Micro Controllers | 25 | 4th August 2007 09:49 AM |
| Please help me in writing code | abdosat2000 | Micro Controllers | 9 | 5th June 2007 01:41 PM |
| PIC Switch Management Techniques | Mike, K8LH | Micro Controllers | 2 | 28th September 2006 12:33 PM |
| How to configure this On/Off Switch with Bicolor LED?HELP ME | Stimulation | Electronic Projects Design/Ideas/Reviews | 10 | 23rd April 2003 04:55 AM |